![]() It was recently expanded to add 440 more beds along with a new state-of-the-art environmental facility and recycling plant to manage waste generated by up to 1,000 inmates. The maximum, medium and minimum-security prison originally opened as a 500-bed facility. ![]() Unfortunately, it had become an expensive and time consuming nuisance. The operations staff was faced with removing the pump for clog removal every two days. Figure 1: The prison previously suffered from clogged submersible pumps in a confined space wet well.
0 Comments
Leave a Reply. |